Hisarya Stadium

The construction of Hissar Stadium was completed in 2014, with the construction of:

A circular athletics track with 6 lanes and adjacent facilities for athletics jumping and throwing, including:

Laying 6700.00m2 of bitumen spread in two layers, loose and dense asphalt concrete.
Athletics track surface: 6700.00m2 of factory-made vulcanized rubber flooring in rolls, 13mm thick, certified by IAAF /International Athletics Federation/
Tribunes. Removal of existing stands and construction of new stands with 4020 seats, including necessary seats for people with disabilities;

Construction of a reinforced concrete canopy over the central entrance to the stadium.

About Project

Name

Hisarya Stadium

Area

Pavement - 6700.00m2
Bitumen spill - 6700.00m2
Grandstand seating - 4020

Duration

1 - Year

Date

2013-2014г.

Client

Hisarya Stadium