Renovation and modernization of an athletics hall, PLOVDIV
ACTIVITIES PERFORMED:
Removal of old flooring
Preparation of the base
Laying 836.00 m2 of sealing primer with a consumption rate of 0.15 kg/m2
Laying 836.00 m2 of a layer of red polyurethane with a consumption rate of 2 kg m2
Laying 836.00 m2 of a layer of red EPDM granules with a consumption rate of 4 kg/m2
Construction of a podium system with dimensions of 2.50 m / 60 m (2 layers of plywood 1250/2500/9 mm each) and laying of a sandwich-type athletics flooring with a roll-on softening layer of black granules, with a minimum thickness of 14.1 mm, IAAF certificate. The flooring is placed on the podium.
Marking the hall with two-component polyurethane paint with a specialized machine for marking athletics tracks
Delivery and installation of athletics equipment
Athletics Hall city of PLOVDIV
Athletics track - 2 700,00m2
1 year
2024 - 2025
City of PLOVDIV