“Renovation and repair of the flooring of the athletics hall, part of the “Dobrotitsa” sports hall.”
The construction works were completed in the period: from 14.12.2018 to 30.05.2019.
COMPLETED CONSTRUCTION AND CONSTRUCTION PROJECTS
1. Athletics track
– Grinding of existing pavement
– Laying of red polyurethane with a consumption rate of 2 kg/m2, Laying of red EPDM granules with a consumption rate of 3 kg/m2
– Delivery and installation of a long and triple jump board with a plasticine indicator, stainless metal bed and cover, IAAF certificate, intended for competitions and training
– Delivery and installation of a bed and cover for a shepherd’s jump, IAAF certified
– Delivery and installation of a fencing element for a jumping hill, including demolition and removal of old concrete
– Delivery and installation of a drainage chute along the periphery of the jumping hill, including demolition and removal of old concrete
– Sizing and marking of the track and sectors with a specialized machine and paint according to IAAF requirements
Shotgun sector
– Grinding of existing old asphalt pavement and repair of the destroyed sections according to the requirements of item 2.1.
– Laying of polished reinforced concrete flooring with an average thickness of 8 cm
– Repair and replacement of a deformation joint
– Delivery of a modular structure for the shot put sector, IAAF certified, certified net with a height of 4 m, distance marbles, standard panels with the possibility of expansion
– Delivery of cushioning mattresses with dimensions 200/100/10 cm
– Delivery and installation of a shot put pushing device, certified by the IAAF
– Delivery and installation of self-adhesive tape
Dobrotitsa - Hall
Athletics Track - 2 700,00m2
6 - months
14.12.2018 to 30.05.2019